GRB Position on the EC Expert Group on the Technical Pillar of the 4th Railway Package Topics

GRB Position on the EC Expert Group on the Technical Pillar of the 4th Railway Package Topics

Wednesday, 15 March 2017

The Group of Representative Bodies (GRB) acknowledges the steps taken to prepare a sound and timely implementation of the 4th Railway Package’s Technical Pillar. To succeed in this, the implementation relies on several key interlinked components and legal acts. GRB calls on all responsible bodies to enforce the transposition of the Interoperability Directive and the Rail Safety Directive into the respective national law by the Member States.